1. Product Description
A highly durable and easy-to-apply waterproofing compound suitable for critical wet areas.
Key Performance Advantages:
- ✓ Ready-to-Use Consistency: Pre-proportioned waterproofing compound minimizes site mixing errors and speeds up application.
- ✓ High-Build Structural Barrier: Applies via brush or trowel to seal critical roof slabs, joints, parapet walls, and wet rooms.
- ✓ Weather & Heat Resilient: Engineered for extreme summer rooftop temperatures across Sindh, Balochistan & Southern Punjab.
- ✓ 1kg to 10kg Contractor Packs: Flexible packaging options (1, 2, 5, 10 kg) for zero wastage on any project scale.
2. Technical & Physical Properties
| Standard Packaging | 1, 2, 5, 10 kg Packs |
|---|---|
| Type | Ready-Mixed Compound |
| Application Method | Brush or Trowel |
3. Site Surface Preparation & Application Method
Step 1: Substrate Cleaning
Remove all dust, laitance, oil, peeling paint, and salt efflorescence by wire-brushing. Repair honeycombs or cracks >2mm before coating.
Step 2: Pre-Dampening / Priming
Lightly dampen absorbent concrete or plaster surfaces with clean water to SSD (saturated surface-dry) condition with no standing puddles.
Step 3: First Protective Coat
Apply the first uniform coat using a stiff brush, roller, or trowel (for Readymix Patlo), working thoroughly into corners, coves, and pipe penetrations.
Step 4: Cross-Coat & Flood Test
Once touch-dry (2–4 hours), apply the second coat at a 90° perpendicular angle. Allow 24–48 hours cure before flood testing or tiling.
Health & Safety
Cementitious and chemical construction products are alkaline when mixed with water. Wear protective gloves and safety eyewear during mixing and application. Wash splashes from skin or eyes immediately with clean water.
Technical Note
Values stated are typical application figures under normal site conditions (25–30°C). Site temperature and substrate porosity may affect open time and coverage. Technical site guidance is available on bulk commercial orders.